SW FiOS Construction Update: 4/12/19

Discussion in 'Southern Walk Announcements' started by SWHOA Admin, Apr 12, 2019.

  1. SWHOA Admin

    SWHOA Admin Southern Walk HOA

    Joined:
    Dec 12, 2017
    Messages:
    31
    Likes Received:
    1
    Phase 2 Construction is nearing final stages. There were a couple delays in this phase due to various technical difficulties.

    It is possible that the Phase 2 addresses (274) will be announced within 10 days and ready to order service.

    As previously reported the rest of the neighborhood is an active FiOS Construction zone and residents on top of the hill on Ridgeway (and feeder cul-de-sacs) and Village Dr (and feeder cul-de-sacs along the eastern side of Village Dr) will see easement construction and trenching to bring the FiOS drop to the homes.

    Verizon still has a stated goal of completing the wiring to Phases 3 and 4 by the end of May.
     
    Last edited: Apr 13, 2019
  2. signifer

    signifer Member

    Joined:
    Aug 19, 2005
    Messages:
    250
    Likes Received:
    6
    And what about phases 3 and 4? Will they be done before the end of May (i.e., before Openband cuts off tv)?
     